FOUNDATION CONSTRUCTION PROCESS:

Positioning and setting out → recheck (including axis and coordinates) → pile driver (model selection) in place → pile driving → pile survey → foundation trench excavation → pile head breaking → leveling → concrete cushion pouring → axis guiding → cushion cap formwork and beam bottom formwork installation → reinforcement fabrication and installation → cushion cap side formwork and foundation beam side formwork installation → foundation formwork and reinforcement acceptance → foundation concrete pouring → maintenance → foundation brick masonry → Back fill

Pile after pouring
Pile after pouring
Second floor beam reinforcement
Second floor beam reinforcement
Raft foundation 1
Raft foundation 1
Raft foundation 2
Raft foundation 2
Raft foundation 3
Raft foundation 3
Reinforcement prototype
Reinforcement prototype
Field binding of reinforcement
Field binding of reinforcement
Reinforcement placement
Reinforcement placement
Reinforcement cage processing site
Reinforcement cage processing site
Reinforcement fabrication, diameter 36
Reinforcement fabrication, diameter 36
Reinforcement fabrication, diameter 36
Reinforcement fabrication, diameter 36
Reinforcement fabrication, diameter 36
Reinforcement fabrication, diameter 36
The specification requires that the straight thread connection shall not exceed 50%
The specification requires that the straight thread connection shall not exceed 50%
Binding construction of foundation reinforcement
Binding construction of foundation reinforcement
Binding of steel bars for ponding pit
Binding of steel bars for ponding pit
Second floor beam reinforcement 1
Second floor beam reinforcement 1
Second floor beam reinforcement 2
Second floor beam reinforcement 2
Lightning protection grounding
Lightning protection grounding
Cloth reinforcement mesh
Cloth reinforcement mesh
Partial erection site
Partial erection site
Partially cast slab wall
Partially cast slab wall
Installation site of partial embedded wall casing
Installation site of partial embedded wall casing
Partial embedded pipeline site
Partial embedded pipeline site
Cushion cap reinforcement in place
Cushion cap reinforcement in place
Bearing platform reinforcement cage
Bearing platform reinforcement cage
Bottom frame template
Bottom frame template
Bottom frame template
Bottom frame template
Construction of floor reinforcement of elevator shaft1
Construction of floor reinforcement of elevator shaft1
Construction of floor reinforcement of elevator shaft2
Construction of floor reinforcement of elevator shaft2
Independent foundation reinforcement
Independent foundation reinforcement
Plastic joint with split bolt
Plastic joint with split bolt
Second floor beam and slab formwork
Second floor beam and slab formwork
Second floor beam, slab formwork and beam reinforcement
Second floor beam, slab formwork and beam reinforcement
Second floor beam, slab formwork and support system
Second floor beam, slab formwork and support system