Lida Group China Prefabricated House Supplier | One-stop Solution for Modular House, Container House! Marketing@lidajituan.com
Board ytong aerated autoclaved ALC panel for building project
ALC Panel Introduction
Autoclaved lightweight aerated concrete sheet (referred to as ALC board) is made of fly ash (or silica sand), cement, aluminum powder and lime as the main raw material. Inside, it has the rebar mesh with anti-rust, anti-corrosion., After high temperature, high pressure, steam curing made of porous concrete sheet, It is a superior performance of new building materials.
According to the usage, the plates can be divided into partition board, wall panels, roof panels (decking floor), anti-fire boards, which are widely used in concrete structures, steel and other industrial and civil construction. The Implementation of standards is GB15762-2008 "autoclaved aerated concrete slab".
The appearance of the plate color is white. The inside board is with rebar and channel to be easy installation.
ALC Panel Characteristic
1)Energy saving and environmental protection
Excellent performance of the ALC wall panels and lightweight roofing combination program, providing excellent insulation, sound insulation, waterproof performance, better than the traditional brick structure. Reduce the amount of wet construction in the construction site, which can effectively control the air pollution caused by the construction process, soil pollution, water pollution and the surrounding environment of the various types of impact, and effectively reduce the waste generated, is conducive to environmental protection.
2)High degree of prefabrication, making a house like a car
Components can be achieved in the factory industrial production, high degree of mechanization, the real realization of residential industrialization, components on the equivalent of standard products, components in the factory for standardized production, quality than in the field of production more assurance, but also can be effectively controlled.
3)Shorten the duration and reduce waste
Components of high standards of factory prefabricated, a substantial reduction in the construction site strength. Components shipped to the site can be directly installed, it can be said to be convenient and fast, greatly shortening the overall duration. In the race against time to grab the construction area, has its unparalleled superiority.
The construction site to reduce the amount of work, to a certain extent, reduce material waste. Component standardization of high degree of production, can greatly reduce the site construction staff with the cost of labor and safety in production are helpful.
4)Node mature, fully furnished
Advanced technology and the introduction of many years of practice, our company has a sound, mature technology system, and the formation of a stable, comprehensive supporting materials supply chain.
ALC Panel:production
1,production and storage of row material
2,production and anticorrosion of rebar mesh
3,material preparation,pouring,inserting
4,Static maintenance and brazing
5,Cutting machine grouping
6,Autoclaved curing and finished product processing
Q: Are you factory or trading company?
A: Our Lida Group have main factory named Weifang Henglida Steel structure Co., Ltd., which is in Weifang city. Qingdao Lida construction Facility Co., Ltd. is in Qingdao city. Shouguang Lida Prefab House Factory is in Shouguang city, all of them are in Shandong province.
Q: How about your production capacity?
A: Pre engineered steel structure building (warehouse/workshop/hangar/shed/high rise apartment): 50000 sqm monthly. Prefabricated house (portacabin/labor camp/site office): 100000 sqm monthly. Prefab affordable house (low cost family/residential/refugee): 4200 units monthly. Container house: 800 units monthly. Light steel villa: 10000 sqm monthly.
Q: How about your quality control?
A: We have got certificate ISO9001:2015, certificate CE EN 1090. Products processing through cutting, bending, welding, shot blasting, ultrasonic testing, packing, storing, loading to ensure no quality defects.
Q: Is third party inspection available?
A: SGS, BV, TUV, etc. are available, it is according to client requirement.
Q: How about your delivery time?
A: Generally within 30 days, it is according to order quantity, partial shipment is allowed for big order.
Q: What about the installation?
A: We'll provide the detailed installation drawing, supervisors guiding installation is available. We can do turnkey job for some kind of projects.
Q: How to ensure the product you supply is what we want exactly?
A: Before placing order, our sales and engineers team will provide you the suitable solution according to your requirements. Proposal drawing, Shop drawing, 3D drawing, Materials photos, Finished projects photos are available, which will help you understand the solution we provided deeply.
We welcome you to contact us for more information of
prefab house and look forward to working with you !
About Lida Group
CONTACT Lida Group Container House Supplier
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China
Lida Group
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China