Lida Group China Prefabricated House Supplier | One-stop Solution for Modular House, Container House! Marketing@lidajituan.com
1. The purpose is to standardize container packaging operations, improve work efficiency, and ensure packaging quality. 2. Applicable area/material. Region: All warehouses. Materials: All materials that need to be packed in containers. 3. Operation process. Code of Practice for Container Shipping. 1. Check the empty container before loading, and take photos for storage; 2. Prepare the packaged goods in advance, check whether the goods are damaged, whether they are tied firmly, and take pictures before packing; 3. Load the goods into the container. Each layer of goods must take photos of the loading situation in order to record the loading situation of each piece of goods; 4. After the packaging is completed, take pictures before closing the box door. Photo records must clearly reflect the vehicle number and container number. ※ Operation requirements 1. Be sure to check the goods before packing to ensure that the packing list and marks are complete, the packaging is not damaged, and the loading is stable; 2. Minimize the gap when loading the container, and fix it with stretch film, wooden squares or ropes after entering the container . When loading small wooden boxes, if there is a large gap in the door, it must be fixed or fastened with wooden boards and squares to prevent the goods from falling and causing damage when the door is opened. 3. If the goods do not fill the container, try to spread the goods on the bottom of the container. 4. Due to the low weight of the center of gravity, the large wooden box can only be installed on one layer, and the bottom area of the box cannot be fully utilized. It should be installed in the center of the container, and the bottom should be fixed horizontally with wooden squares.
4. Major risks and control measures There are risks in the operation content. The goods fall, the box body is forked, the goods collapse, and the control measures are taken. The speed limit for forklifts on the boarding bridge is 5 km/h. Novice forklifts are strictly forbidden to operate on the bridge; in bad weather or insufficient lighting, it is forbidden to use the boarding bridge in heavy rain, heavy snow, etc.; when loading small wooden boxes, if there is a large gap with the box door, they must be fixed with wooden squares or ropes; When the container is unloaded and the door is opened, in order to prevent the cargo from falling and hurting people, only one person is allowed to open the container. Pay attention to reasonable stacking and fixing when packing. 5. Precautions for packing. 1. Strictly follow the sign requirements and pay attention to the shipping signs on the wooden box. Stacking layers limit, handle with care, afraid of rain. 2. Bare packaged products (such as heavy-duty frames or products with better rigidity) should be placed at the bottom of the cabinet as much as possible. If it is necessary to mix with wooden boxes, wooden boxes should be placed on bare box products as much as possible. If you need to put the naked packaged product on the wooden box, the width of the naked packaged product must be greater than the width of the wooden box, otherwise it is easy to crush the wooden box. 3. When installing the cabinet, try to make the stacking height of the items in the cabinet almost as high as possible, which can play a role in mutual fixing. If the items on one side of the cabinet are completely higher than those on the other side, the cabinet is prone to shifting and damaging products during transportation. 4. When installing the cabinet, if the width of the goods is installed on the upper layer, the width and height of the wooden box on the lower layer>= Auxiliary wooden square of wood, wooden square needs to be fixed with nails. Such as the height of the auxiliary wood.
We welcome you to contact us for more information of
prefab house and look forward to working with you !
About Lida Group
CONTACT Lida Group Container House Supplier
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China
Lida Group
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China