loading

Lida Group China Prefabricated House Supplier | One-stop Solution for Modular House, Container House!     Marketing@lidajituan.com

Do you know how to install the prefab house?

by:Lida Group     2022-02-13
If you don't work hard or sow seeds, no matter how fertile the soil is, no crops will grow. If you don't struggle and create, no beautiful youth will bear fruit. Hello everyone, have you traveled recently? Be sure to pay attention to travel safety and personal protection while playing. Don't lax personal protection just because you are having fun. Next, I will introduce to you how to install the prefab house.

The prefab house is a kind of temporary building, which is often used in the temporary dormitory office of construction site workers, factory buildings, field work places, exhibitions, warehouses and outposts and other fields. It can also be used in offices, headquarters, dormitories, warehouses, shops, toilets, equipment rooms and various temporary and mobile rooms in construction, railway, highway, water conservancy, petroleum, tourism, and military industries. For the friends who have purchased the prefab house, today I will share with you some installation methods of the prefab house: First of all, you should dig a groove and lay the foundation. The foundation can be a brick foundation or a concrete foundation; secondly, the installation of the frame, the frame of the box-duoduo prefab house is welded by 80C steel, which has the characteristics of strong rigidity and good corrosion resistance, and can be roughly divided into Columns, flat beams, triangular beams, purlins, ground beams, large triangles and small triangles are connected by screws. After that, stairs, aisles, and the second floor should be installed for floor laying; after the frame is installed, maintenance materials, that is, color steel plate installation, should be installed in the world; the box-duoduo prefab house uses rock wool composite panels with Class A fire resistance, and then the doors and windows are installed. And interior decoration, if the customer chooses the ceiling material, it should also be matched with the ceiling. Installation attention points: Before installing the wall panel, check whether the column and wall beam are installed correctly, firmly and flushly. The vertical joints of the metal-faced sandwich panel wall panels should be jointed with tongue and groove joints or I-shaped aluminum joints, and sealants should be provided at the joints. The connection of metal-faced sandwich panels to ground beams, wall beams or floor sub-trusses shall be bolted. The horizontal spacing of connecting bolts should be no more than 500mm (no less than two bolts should be set in the width direction of each plate). The embedded wall panels should be installed in the grooves on both sides of the column in time when the cold-formed thin-walled steel structure is installed. The upper and lower lap joints of the embedded wall panels should be tongue-and-groove joints, and the outer panels should be lapped downward, and the lap length should be Should not be less than 15mm.

The above content in this article is the general introduction of the editor about how to install the prefab house. If you have other questions, you can leave a message in the comment area below, or Contact us through the contact information below. I hope everyone can gain more or less from the article of the editor, thank you for reading.


Lida Group thinks that a good rule of thumb to determine whether you're working on a project.
Lida Group are dedicated to providing excellent underwriting and loss control advice up front, and to ensuring superior customer service through the life of the policy.
Lida Group has developed a unique technology with many applications including prefab house manufacturers.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...