Lida Group China Prefabricated House Supplier | One-stop Solution for Modular House, Container House! Marketing@lidajituan.com
Light steel villa is a new type of building. Compared with traditional cement buildings, there will be some differences. Let us introduce the importance of light steel villa circuit installation and construction. You are helpful.
Introduction to the circuit
1. The light steel structure house wiring should be installed concealed and installed in strict accordance with the wiring construction drawings. Installation specifications should be carried out in accordance with electrical installation standards.
2. In home decoration, it is necessary to embed dark lines in the lines of strong electricity (lighting, electrical appliances) and weak electricity (television, telephone, audio, network, etc.).
When wiring the light steel villa, the strong electricity rises and the weak electricity falls. The principle is to avoid cross, beautiful and practical.
Circuit material requirements
1. The cross-sectional area of u200bu200bthe conductors used when selecting the line for the power line should meet the maximum power of the equipment used.
2. Flame retardant PVC casing must be provided when laying dark wires
1. It has good impact resistance and heat resistance: the sleeve will not be damaged under normal tamping impact. Will crack and will not soften due to the heat of condensation during construction.
2. Moisture proof, acid and alkali resistance: PVC casing has excellent moisture resistance, acid and alkali resistance, and will not rust. All joints are bonded with polyvinyl chloride adhesive according to regulations, which can prevent water from infiltrating into the pipe and has a good moisture-proof effect.
3. Flame retardant: The PVC plastic sleeve will automatically extinguish the fire (within 30 seconds after leaving the flame), and the flame will not spread along the pipeline.
4. Insulation: the shell has excellent insulation performance
5. Convenience in construction: the casing below D32mm can be easily cut off with a pipe cutter, and the corresponding special spring is inserted into the pipe, The pipe can be bent to the desired angle by hand at room temperature, and the use of PVC adhesive can quickly and easily connect the casing to the pipe of the desired shape for construction.
3. Cassette tape installation
Put the cassette tape holder in the corresponding position, adjust the position and level, and use the hand-held electric drill to set and fix the self-tapping screw. Subsequently, the box is installed and fixed on the box fixing member. Insulation PVC sleeve and cable installation PVC plastic sleeve Fire self-extinguishing (flame self-extinguishing within 30 seconds) Lines of voltage, different circuits and different signals are strictly prohibited from being worn in the same conduit. The wires of the same circuit should be inserted into the same conduit, and the total cross-sectional area of u200bu200bthe wires shall not exceed 40% of the cross-sectional area of u200bu200bthe conduit.
Remember not to connect the wires in the conduit, that is, if the length of the wires is not long enough to connect the wires, the wire splice cannot be in the conduit, the wires should generally be connected in the junction box, such as switches, sockets, lamp sockets box etc.
The power system should take appropriate protective measures, including grounding protection and zero-connection protection. Ground protection is usually used. It is strictly forbidden to use two protection measures at the same time. The line interface should be smooth and the connection board should be firm. Do not block the conduit with wires.looking for the best deal while getting a quality is usually the number-one objective for most container frame manufacturer.
Lida Group also values the time, skills, and expert opinions of our staff. We are committed to providing fair and living wages, reasonable, structured work schedules, and clear duties and spheres of rights and responsibilities for each team member.
Another way to maintain the professional yet engaging innovative technology in prefab houses is by embedding new skills directly on manufacturing.
We welcome you to contact us for more information of
prefab house and look forward to working with you !
About Lida Group
CONTACT Lida Group Container House Supplier
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China
Lida Group
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China