How should we build the prefab house after we purchased it?
I. Construction process
Setting out—digging foundation trench—C15 concrete foundation beam and ground concrete pad Floor construction - ground beam installation - column installation - floor beam system installation - walkway system installation - exterior wall panel installation - window installation - door installation - canopy system installation - roof system installation ——Inner partition board installation——PVC ceiling——cleaning site——Completion acceptance
Second, construction points
When adjusting the elevation of the ground beam, the two ends of the same ground beam should be ±5MM, and the span between the spans should be controlled within ±10MM. A waterproof groove should be installed between the floor beam and the wall panel, and the waterproof groove should be sealed with glass glue to prevent water leakage. The verticality of the column installation is measured with a magnetic force line pendant, and the deviation is controlled within L/100, and ≤10MM. Fill the gaps between the walkway boards with glass glue. The seams between the roof panels are sealed with sealant.
III. Construction requirements
1) Steel structure
The installation position of each component should meet the design requirements, and the position of the on-site welding parts should be accurate, without false welding and missing welding.
2) Fasteners
a. Fasteners should comply with GB5782 regulations
< /p>
b. The bolts must be installed in the correct position according to the design requirements, and the gaskets must be well padded.
C. The connecting bolts between components must be tightened.
3) Paint
a, after on-site welding and the peeling of the primer during transportation, a layer of anti-rust paint should be repainted
b. The exposed parts of the components should be brushed with two layers of topcoat, and the paint should not be leaked, peeled, painted or rusted.
4) Walls
a. According to the layout plan, the sandwich color steel plate, the wall must be corrected, and the umbrella The corners and outside corners of the wall are sealed with angle aluminum, and the connection between the board and the board is made of I-shaped aluminum. The rivets are Φ5X13@300, the top and bottom of the nails should be consistent, and there should be no staggered, and self-tapping bolts are used for necessary parts.
b. Mark the position of doors and windows according to the design drawings, use a cutting machine to cut out the positions of door and window holes, install windows and doors according to the positions of door and window holes, the windows are plastic steel windows, and the sandwich core cut by the guard The color steel door is used for the ceiling of the bottom layer, and the ceiling material is PVC gusset plate.
Given the important role played by in ensuring proper functioning of flat pack homes, every individual must take an interest towards improving prefab villas manufacturers.
The best way to confront your container frame problem is to search for a high quality offered by Lida Group at Lida Group. Take a look!
Using high technology, prefab houses showed its competitive advantages, captioned with information about the company's commitment to providing safe, reliable, profitable jobs to local artisans.
Our company specializes in manufacturing prefab houses mainly prefab shipping container homes.
You can get more information from Lida Group for on sale. welcome to visit us and send your inquiry!
We welcome you to contact us for more information of
prefab house and look forward to working with you !
About Lida Group
CONTACT Lida Group Container House Supplier
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China
Lida Group
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China