Lida Group China Prefabricated House Supplier | One-stop Solution for Modular House, Container House! Marketing@lidajituan.com
How to install the prefab house to make it safer and stronger?
As prefab houses have become more and more widely used in the market in recent years, I have found that in pursuit of huge profits, some manufacturers contract businesses at low prices to ensure profits, regardless of their reputation and quality, failing to implement good products. Monitoring systems, cutting corners and sloppy construction pose serious safety hazards to the quality of prefab houses.
The prefab house is not equipped with professional welding personnel, which will lead to poor welding quality of the electrode in the prefab and improper location selection. Due to the limitation of the construction site, the construction site of the prefab house is not selected correctly, and the areas where landslides and landslides may occur cannot be avoided; the soil quality of the prefab house foundation is unstable.
Before the construction of the prefab house, no relevant investigation was done, the construction was not carried out as planned, and the load was overweight. Some units are stacked with groceries on the second floor and arranged for too many people to live and use, resulting in overloading and prone to accidents. So, how to install the prefab house more safely and firmly? Let's take a look at the container house editor!
During the installation of the prefab house, you need to pay attention to the following points:
1. Fire resistance
The fire separation distance should meet the design and specification requirements, the fire passage should be unobstructed, the configuration of fire hydrants and fire extinguishers should meet the design requirements, and the layout should be reasonable. The oxygen index of the metal sandwich panel shall not be less than 32. Wood floors and other combustible materials should be fire resistant.
2. Stability
The panels of the prefab house should be installed stably, the cornices should be straight, and the overlapping direction of the panels should be correct and consistent.
3. Lightning protection
The lightning protection grounding setting meets the requirements of the design specification, and the grounding resistance should be qualified.
4. Corrosion resistance
Steel parts should be well painted, not rusted, and exposed bolts should be properly protected. The anti-corrosion measures in the strong corrosive environment should meet the design requirements. The area around the activity room should be drained without water, and no debris is allowed.
3. The electrical configuration of the circuit needs to meet the requirements
Prefab house The electrical lines in the prefab house should be covered with PVC pipes (slots), the lines should be neat and beautiful, the electrical configuration should meet the design requirements, and the lines should be free of insulation aging and extended service life.
4. Drawing selection
There should be no obvious deformation or damage to the cabinet panels (roof and wall panels) of the movable board room; the fixing bolts, waterproof washers, metal washers, nylon sleeves, etc. are complete, the connection is reliable, and the sealant is complete and effective.
Seven, the wall panel interface should be flat
The attached wall panels should be installed correctly, the surface should be flat, and the recessed wall panels should be installed smoothly. The upper and lower lap joints should have slits, and the outer panels should be lapped downward. The lap length should not be less than 15mm.
In order to make it stronger when installing the prefab house, please pay attention to the above points. In order to reduce prefab house installation problems, this will pose a hidden danger to your own safety.
The above is the whole content of 'How to install the prefab house to make it safer and stronger?', if you have any questions about the container house and living in the container house, please consult the container house online customer service, or you can communicate directly by calling !
We are a performance driven culture that uses prefab houses to ensure continuous improvement.
Super quality are in offer at Lida Group, welcome to visit us.
While manufacturing prefab houses, we always pay attention to the technology and quality of the product.
People tend to want what they perceive they cannot have. Making Lida Group seems exclusive or as if it will go out of stock if they don't act quickly often makes it more enticing to the consumer and increases the likelihood that they will buy in.
Lida Group believes that the shorter the path between consumer and product, the more likely businesses are to convert more sales.
We welcome you to contact us for more information of
prefab house and look forward to working with you !
About Lida Group
CONTACT Lida Group Container House Supplier
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China
Lida Group
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China