Lida Group China Prefabricated House Supplier | One-stop Solution for Modular House, Container House! Marketing@lidajituan.com
double floor worker camp in Saudi and Qatar :
Detailed Product Description
Steel frame:
Material:cold formed steel profiles in 3.5mm thinckness.
Surface finished: sand blasted in a quality of Sa2.5,epoxy ground coat in 30-40µm thinckness and final vinyl acrylic coat in 60-70µm thinckness.
Floor
Girding structure:40*80*1.6mm square steel pipe.
Damp proof steel panel:1.5mm thinckness
Water proof polywood panel: 18mm
Glued final floor covering: Korea LG floor leather.
Roof
Girding structure: 40*30*2mm square steel pipe
External waterproof panel: color steel panel in 0.5mm thinckness.
Internal ceiling: sandwich panel of 75mm PU. The both surface is fireproof panel,with PVC
ceiling.
Wall
Wall panel: sandwich panel of 75mm PU with both surface of fireproof panel.
Doors and windows:
The materials and dimension as per your requirment.(Aluminium,Alloy window or plastic steel windows)
Bathroom:
It will be equipped with one toilet bowl,one wash basin,one shower equipment.we can offer others if you need.
Kitchen:
We can offer one kitchen cabinet. We can provide as per your requirement.
Pls feel free to contact me if you are interested in i
We welcome you to contact us for more information of
prefab house and look forward to working with you !
About Lida Group
CONTACT Lida Group Container House Supplier
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China
Lida Group
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China