Lida Group China Prefabricated House Supplier | One-stop Solution for Modular House, Container House! Marketing@lidajituan.com
The packing box room is an integrated mobile room made of steel plates, sandwich panels, bolts, aluminum fittings, concrete, wood, ceramic tiles, glass, paint and other materials through standard technological processes. It can be moved anywhere, recycled anytime and anywhere, recycled, safe, environmentally friendly, beautiful, economical, fast and efficient. In addition, it is also environmentally friendly, does not produce any garbage, and will not cause any pollution to the surroundings. It is like a box and can be moved anytime, anywhere.
Material price for packing box room
Top box corner specification: 210*150*200, galvanized 80g/㎡ unit price 75 yuan/piece
Top beam 175(160)*70, 5633mm long, 3mm thick, galvanized 80g/㎡ unit price 215 yuan/piece
Top beam 175(160)*70, 2698mm long, 3mm thick, Galvanized 80g/㎡ unit price 105 yuan/root
roof purlin C80*40*15*2.0, 2990mm long, galvanized 80g/㎡ unit price 33 yuan/root
top frame corner Connector 343*125*39, 3mm thick, surface galvanized piece 4, unit price 11 yuan/piece
Inlet box 395*100*100, 2mm thick, ordinary steel plate rolled piece 2
Bottom box corner 210*150*140, galvanized 80g/㎡, piece 4
Bottom beam 160(140)*87, 5633mm long, 3.5mm thick, galvanized 80g/㎡
p>Bottom beam 160(140)*87, 2698mm long, 3.5mm thick, galvanized 80g/㎡
Floor purlin C120*50*20*2.5, 2990mm long, galvanized 80g/ ㎡
Screw fork connector 110*30*23, 3mm thick, galvanized
w-type water baffle (55+110+40+45) mm, 16mm high, 2.5mm thick, galvanized
Corner column shape: 210*150*30(mm), 2470mm high root 4 116 464 L-shaped up and down
connecting angle 204*144, 10mm thick, 6Ф14 holes
L-shaped column stiffeners (117+177)*30mm, 2mm thick, ordinary steel plate bending
The welding seam of the load-bearing frame of the packing box room shall not be opened Welding, rust and repair welding should be stopped for serious rusted welds. Anti-rust oil should be applied to the active link parts of components and accessories for maintenance. When components and plates are bent and deformed, they should be repaired or replaced in time. When doors and windows and accessories appear When it is broken or damaged, it should be repaired or replaced in time. Before the reassembly of the box-type house within the turnover period, the inspection and maintenance of the main components should be stopped. Only when the quality requirements are met, the relevant personnel should be arranged to stop the construction status of the temporary building. Regular inspection and maintenance, and timely measures should be taken to deal with the problems and hidden dangers found in the inspection process.
We welcome you to contact us for more information of
prefab house and look forward to working with you !
About Lida Group
CONTACT Lida Group Container House Supplier
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China
Lida Group
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China