The packing room adopts the model of 'factory prefabrication + on-site installation'. The production enterprises generally pass the EIA, and the frame is painted. No construction waste will be generated during installation, and after the project is demolished, no construction waste will be left behind, and the resident environment will not be damaged. The packing box is a welded structure, and the steel structure adopts galvanized technology. It consists of a structural system, a ground system, a floor system, a wall system, and a roof system. Each system consists of several unit modules. The unit modules are manufactured in the factory. The field is completed by unit module assembly. Since the packing room is a welded structure, a lot of electricity will be used during the installation of the packing room. A standardized and orderly management construction site is not only conducive to the safety of construction workers, but also ensures the construction progress and construction quality. Increase the pleasure of operators and site managers and reduce fatigue intensity. Due to the particularity of the construction of the integrated house, it does not require wet operation, so there is no need to pass water, but electricity is required during the installation process, so there are strict requirements for the layout of the circuit and the distribution box. Let's talk about the precautions for using electricity when installing the packing room.
Due to the large use of live construction machinery in the construction process of the packing room project, and the tight construction period of this project, the number of construction machinery has increased compared with usual, so the average daily electricity consumption during the peak period of electricity consumption during the construction process It is 100 degrees, and the average daily electricity consumption is 70 degrees. Each building on the construction site is equipped with a special distribution box with 8 over-the-top sockets for 380V and 220V. When connecting an external power supply, pay attention to whether the power of the external power supply meets the actual power used by all the box-type rooms on the construction site, and avoid tripping or damage to the power switch due to insufficient power. The electricity has been installed, so let's start to solve the water problem. It is still necessary to explain here that we must pay attention to the waterproof problem at the water and electricity interface, so as to avoid unsafe situations such as circuit short circuit and leakage. The water and electricity of the house can be put into use normally, but do not use high-power electrical appliances at the same time to avoid damage to the internal circuit. Regularly check the water and electricity conditions to save water, and turn off the water and electricity in time when not in use.
We welcome you to contact us for more information of
prefab house and look forward to working with you !
About Lida Group
CONTACT Lida Group Container House Supplier
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China
Lida Group
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China