loading

Lida Group China Prefabricated House Supplier | One-stop Solution for Modular House, Container House!     Marketing@lidajituan.com

Prefabricated houses built the foundation treatment of 5 points

by:Lida Group     2020-07-06
Prefabricated houses built the foundation treatment of five points whether new house or installation of prefabricated houses, the foundation is directly related to the stability of the houses and prefabricated houses. The hardness of first foundation must conform to the requirements, otherwise may cause safety problem such as houses collapsed. Trailer to solid and reliable, a solid foundation is essential. Both in traditional housing and trailer, before in the construction of foundations, its foundation is the difference between the mobile and ordinary houses time short, the cost is low. Compared with live one container, prefabricated houses when building need to lay the foundation. So this foundation how to play? In the following paragraphs, small make up will detailed describe, want to know friends can come to see. Prefabricated houses building foundation treatment of the five key points: 1, the first to have the hardness test, for the hardness of special terrain or foundation have bigger difference, should make special processing steel structure housing activity can smooth installation and ensure its quality. Technical personnel should be measured in advance. 2, level, after completing the measurement of the foundation, the next step is basic casting, then focuses on must first measure good level, after finished the casting, should control the error of the level of 10 mm. Note that with each other in the process of replacement and after the completion of the foundation, must ask for guarantee foundation surface level within the error, so as not to affect the subsequent work process. 3, concrete grade, usually based in c20 and unreinforced, of course, for special terrain or other force majeure conditions, shall, according to the determination of the technical personnel to top the final solution. 4, pouring time, just like conventional concrete pouring process, the steel structure housing activity also can not reduce the process, after the completion of the base casting or prefabricated houses before installation should leave plenty of time to make concrete meet the hardness requirements. 5, the last of the casting, production base, at the same time, must complete, casting with indoor ground level as basis, this ensures that the time limit for a project, quality and after installing a beautiful. Prefabricated houses after installed in the indoor floor, convenient and clean already so, will not affect the appearance and quality
Maintaining prefab homes is not as easy as it may seem. You have to do plenty of important tasks. So cruel is the truth unless you've got a to help you.
Lida Group offers best-in-class products, fast delivery time, and personable, highly competent, and unparalleled services.
Lida Group knew if this worked for us, it would work for others, so we took the exclusive product and program and re-developed it to be more accessible to customers.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...