Lida Group China Prefabricated House Supplier | One-stop Solution for Modular House, Container House! Marketing@lidajituan.com
What are the application scopes of construction elevator doors? Construction elevator doors are used as safety protection to avoid accidents. Elevator users process and manufacture according to the installation conditions at the construction site, resulting in a wide variety of hoistway safety doors with different sizes, and some inferior safety doors pose serious safety hazards.
Once the safety door with potential safety hazards is used to rescue the passengers trapped in the car, it is very likely to cause serious casualties. For the convenience and safety of the installation of the construction elevator door, the same size of the construction elevator door is a double door of 1800mm*1500mm. Elevator protective door is the necessary protective equipment to prevent personal injury on the construction site, and it is suitable for all kinds of construction sites.
The following requirements must be met when erecting the construction elevator safety door. The construction elevator safety door connecting wall rods should be installed on the platform frame along the building side vertical poles at a distance not greater than 20cm from the main node, and the connecting wall rods should be set horizontally , or slightly downward, the required inclination angle shall not be greater than 10 degrees, the vertical horizontal rod should be set on the inner side of the vertical rod, and the inner end of the horizontal horizontal rod is separated from the wall. The vertical sweeping rod should be fixed on the vertical rod 200mm above the base.
The horizontal sweeping rod should be fixed on the vertical rod immediately below the vertical rod. The butt fasteners of adjacent vertical rods should not be within the same height, and the staggered distance in the height direction should not be less than 500mm. The opening of the butt fasteners should face inward. . When the platform frame reaches the structural point of the wall parts, the wall tie should be made in time. Except for the vertical pole, other poles should be erected with the whole steel pipe, and the use of butt joints is strictly prohibited.
We welcome you to contact us for more information of
prefab house and look forward to working with you !
About Lida Group
CONTACT Lida Group Container House Supplier
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China
Lida Group
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China