What is the installation sequence and method of the prefab house?
Prefab house installation is similar to high-rise buildings. The foundations of nearby and partition walls should be leveled. It is best to use reinforced concrete, then use struts to connect the skeleton with beams, upper partitions, exterior wall panels, and door and window frames; lay the floor, then install one level up, then install the roof trusses and house panels, and finally install doors and windows, etc., and Pull the vertical support. There are sanitary ware, hardware, etc. So, what is the installation sequence and method of the prefab house? Let's take a look at the editor of the container house!
Preliminary steps of the prefab house:
1. Digging;
2. Foundation, there are brick foundation and concrete foundation;
3. Steel frame device;
4. If it is multi-storey, please install prefabricated floor slabs;
5. Color steel plate device;
6. The first floor;
5. Installation of doors and windows;
6. Interior decoration;
Prefab house installation steps:
first step:
Allow the building foundation to dry for at least 3 days before starting to build thick house walls, according to the prefab house foundation construction drawings. Place the ground beams close to the inside of the double lines in the plan and connect them with blast bolts, and build pillars at the corners of the ground beams and at the corners where each ground beam joins. Note: Double angled holes are built into both ends of the gable of the flat house.
Step 2:
Assemble the wall on the ground according to the various views of the construction drawing, rive it on the aluminum floor hasp groove with 5.2 rivets at the bottom, remember to cut the position of the doors and windows according to the direction construction drawing, pay attention when riveting the aluminum frame: do not rive first Between the board and the board, the position of the fixed door and window should be laid and assembled first, and then the aluminum frame of the door and window should be riveted.
third step:
Install the assembled board step by step in all directions according to the floor plan of the board room. The board is riveted with rivets, the outer corners are riveted with arc aluminum, and the inner corners are riveted with angle aluminum. riveted.
the fourth step:
According to the large wave tile distribution diagram in the construction drawing of the prefab house, place the large wave tiles on the completed entity one by one, and connect them with 75 self-tapping screws.
the fifth step:
Roof tiles riveted on the ridge of the prefab house, the gables are attached to the gable cap, the front and rear eaves are attached to the sink, both are riveted with rivets. (The flat roof type has no ridges and roof tiles.) Finally, apply glass glue to every crevice and rivet in the plank roof, then apply glass glue to the exterior walls and gaps near windows.
The concealed project of prefab house means that in the construction process, after the completion of the previous process, it will be covered up in the next process, and all parts that cannot be inspected will be decorated for interior decoration after completion. 'Concealed engineering' is the key, if the 'concealed engineering' is not done well, no matter how beautiful it looks, it will be futile.
'Concealed works' can be divided into tap water installations, electrical installations and moisture-proof and waterproof works. Every item in the process cannot be ignored. If there is any doubt, it may cause serious economic loss and may even endanger personal safety. Identify construction techniques and waterproofing engineering data to prevent unnecessary financial loss and injury.
The above is the whole content of 'The installation sequence and method of the prefab house?', if you have any questions about the container house and the residential container house, please consult the online customer service of the container house, or call directly for consultation!
Building a brand as Lida Group from the very start is simple so long as you keep 'the three C's' in mind: clarity, consistency and constancy.
We believe our capacity can give you an impressive experience by using prefab houses.
By building an connection around Lida Group and catering specifically to the craft beer crowd, Lida Group was able to raise the capital and brand awareness needed to successfully break into the domestic market with a groundswell of support.
prefab houses has a very good repute over the global market.
We welcome you to contact us for more information of
prefab house and look forward to working with you !
About Lida Group
CONTACT Lida Group Container House Supplier
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China
Lida Group
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China