Lida Group China Prefabricated House Supplier | One-stop Solution for Modular House, Container House! Marketing@lidajituan.com
What is the use of installing color steel fence on site?
What is the use of installing color steel fence on site To make the construction site a relatively closed space, including the selection of various masonry materials to build the envelope structure, and the selection of various formed boards to form a whole. protector. In front of the fence, the lower plinth, usually cast in masonry or concrete, is constructed by civil engineering. Using mechanical expansion bolts and chemical thread detection, the steel base plate at the bottom of the column is fixed in the center of the lower base, and the color steel enclosures on the site are evenly distributed.
If the bottom of the color steel enclosure structure on the construction site is not formed, the steel lining of the column should be directly buried in the wall until the maintenance period of the wall is completed. Formal construction; or the steel lining of the column shall be electrofusion welded to the embedded part. Method for placing prefabricated inserts on walls. Both methods feature a stronger connection than a bolt, but pre-embedded sections. Pay attention to straight and horizontal lines when setting. The spacing between the column and the steel lining must be consistent with the planned dimensions to ensure that the pre-assembled semi-finished product can be connected to it. In the straight line interval, use the upper and lower parallel lines to adjust the datum. After the guardrail installation is complete, ensure the straightness of the upper and lower ends. Construction Site Fences
The construction site fences are installed and attached to the lateral and rigid steel linings of the guardrails, with reinforcement fittings for various bearing points, before leaving the factory. During construction on site, only the lateral linings of the guardrails and columns need to be connected and fixed.
We welcome you to contact us for more information of
prefab house and look forward to working with you !
About Lida Group
CONTACT Lida Group Container House Supplier
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China
Lida Group
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China