Lida Group China Prefabricated House Supplier | One-stop Solution for Modular House, Container House! Marketing@lidajituan.com
Now there are container prefabricated houses in many markets, and they appear frequently in life. They are mainly used in the construction of temporary housing for workers to live and work temporarily. It has the characteristics of mobility and convenience. The cost is also much lower than ordinary houses. So when we install and build the packing box, it is a very important step to build the foundation. How to do it is as follows. What are the requirements for the packing box construction? 1. Gray line stakeout: stake out according to the location of the living area plan. 2. The installation position of each component of the construction site packing box should meet the design requirements, and the location of the welding parts on site should be accurate, without false welding or missing welding. 3. The bolts must be installed in the correct position according to the design requirements, and the gaskets should be well padded, and no less or missing installation is allowed. 4. The connecting bolts between components must be tightened. 5. Fasteners should comply with the provisions of GB5782. 6. After on-site welding and transportation, the place where the primer peels off should be repainted with a layer of anti-rust paint, and the exposed parts of the components should be painted with a second layer of top paint. Rust phenomenon. 7. The container office and the first piece of the wall must be calibrated according to the board layout plan. The corners and sun corners of the umbrella wall should be sealed with corner aluminum. The connection between the boards should be I-shaped aluminum. The seam depth should be the same, neat and clean, the wall surface should be clean, the color should be the same, the seam of the board should be neat, the top and bottom of the nailing surface should be consistent, and there should be no staggering, and self-tapping bolts should be used for necessary parts. 8. Indicate the position of the door and window of the container conference room according to the design drawings, cut out the position of the door and window hole with a cutting machine, and install the window and door according to the position of the door and window hole. 9. The doors and windows are installed correctly and fastened with bolts. The location of doors and windows should be opened flexibly without blockage, the glass should not have pockmarks and cracks, the glass should be clean, and the accessories should be installed firmly. 10. Floor slabs should be laid with dust, and installation and use are not allowed if there are cracks between the slabs. The surface of cement or fine stone concrete should be compacted and calendered, and defects such as cracks, peeling and sanding are not allowed. 11. The gutter joints should be firmly connected, and the joints should be made of waterproof glue. There should be no water accumulation in the gutter, and there should be no water leakage.
There is a strong need for more research on , in order to be able to provide strong and conclusive evidence of their container frame effects. However, recent studies have provided valuable insights into how the intake of may result in improved flat pack homes.
If you would like to learn more about prefab shipping container homes prefab houses, and other types, please be sure to visit Lida Group. We can offer you top quality as well as cost saving price.
Getting prefab houses from an idea to production is a complex process. It involves significant research, time, planning and patience. But with the right information, the right resources and the right product, it's possible.
In order to obtain the most suitable for your prefab villas manufacturers, you need to contact qualified suppliers which can produce super quality to your specifications and offer a friendly price.
We welcome you to contact us for more information of
prefab house and look forward to working with you !
About Lida Group
CONTACT Lida Group Container House Supplier
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China
Lida Group
Tel: +86-532-88966982 88965892
Whatapp/Wechat: +86-13793209022
Email: Marketing@lidajituan.com
Website: Prefabricated House Supplier/ Container House China / China Prefabricated House
Head Office: 5th Floor, Building A, Darron Center,No.180,Haier Road, Qingdao, 266000,China